Title: Role of Flood Dispatching Conducted in Wujiangdu Hydropower Station in Construction Diversion Scheme of Goupitan Hydropower Station
Abstract: The design for diversion scheme of Goupitan Hydropower Station is very difficult,because the valley in the dam site is narrow as well as peak flood is high and big.Through researching on flood dispatching of Wujiangdu Reservoir located at its upstream,it is considered that the scale of diversion tunnels of Goupitan Hydropower Station could be reduced if Wujiangdu Reservoir could dispatches and stores flood during the construction period.The paper raises a basic flood dispatch method equal storage methodfor Wujiangdu Reservoir.Through calculating and comparison this diversion scheme is recommended that Guopitain Hydropower Station adopts three tunnels with section of 156m×177m as well as Wujiangdu Reservoir reserves capacity of 550×106 m3.
Publication Year: 2003
Publication Date: 2003-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot