Title: Discussion on Optimizing Flood Design Method of the Construction Period for Cascade Hydropower Stations on the Upstream of Yellow River: a Case Study in Gongboxia Hydropower Station
Abstract: Although the flood design method is difficult in the hydrologic calculation for the cascade hydropower stations, a set of prefer integrated mode for design flood and construction flood has been summarized through ten years of work on the cascade hydroelectric stations on the upstream of Yellow River. The method will been illustrated with the course of optimizing construction design flood of Gongboxia Hydropower Station on the Yellow River, and some options and question existing in the work will be definitely replied.
Publication Year: 2004
Publication Date: 2004-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot