Title: Study on simulation of dam construction for Xiangjiaba Hydropower Project
Abstract: The simulation of the dam construction for Xiangjiaba Hydropower Project is studied in accordance with the construction program hereinafter; from which the intensity of construction, the utilization factor of the construction equipments, the asymmetry coefficient, the construction schedule and the dynamic appearances of the construction are obtained. On the basis of this, the simulated results are visualized and analyzed as well, and then the construction scheme can be intuitively analyzed whether it is reasonable or not with the appearances given. In this way, the construction scheme can be optimized at last.
Publication Year: 2005
Publication Date: 2005-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot