Title: An example of optimization in road betterment project
Abstract: Optimization of road and pavement projects requires that the most economic means be employed throughout the project from appropriate design to construction technique. International tender projects are renowned for the long period between the preparation of tender documents and the award of the contract. This delay period should be used for resurvey and reinvestigation of the traffic volume, availability of local materials, original design method, future economic activity and construction methods. An example is given of a road project in java, where changes were made after consultation between engineers, contractor and client.
Publication Year: 1983
Publication Date: 1983-08-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot