Title: Conversion of Rapid City Pilot Plant: Phase II, preliminary detailed design. Volume III. Design and construction cost estimates, overall-program costs and schedule. Phase II final report, December 15, 1977--August 15, 1978
Abstract: The costs associated with the design and construct phases, III and IV, were developed from the detail contained in Volume II of this report. Those costs plus those for the plant startup and test program, the latter items being detailed in Volume I, are reported here, in Volume III. In addition the overall design/construct/test program schedule is developed and presented here.