Title: Construction and operation of a prototype RESOX plant in conjunction with Bergbau-Forschung FGD system. Final report
Abstract: This report describes work done on an EPRI sponsored program intended to evaluate a dry FGD system. The program combined an existing Bergbau-Forschung activated coke SO/sub 2/ regenerative adsorption plant with the Foster Wheeler RESOX process. This process reduces concentrated SO/sub 2/ from the adsorption plant regenerator to elemental sulfur using coal as a reactant. The front end adsorption plant operates with a 43MW slip stream from the Kellerman Power Station located in Luenen, Germany. The EPRI funded program designed, built and tested the RESOX system in conjunction with operation of the Bergbau-Forschung FGD plant. Throughout the report mechanical performance aspects of the program are emphasized. The RESOX system processed SO/sub 2/ rich gas for an accumulated total of 1000 hours. Experience gained during this operation is discussed.
Publication Year: 1982
Publication Date: 1982-07-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot