Title: Environmental management plan for Lao Cai province
Abstract: The objective of the Renewable Energy Development Project (REDP) is generating electricity with average output of 127.89 million kWh, in addition to contributing to improving infrastructure, creating revenues for local budget, restructuring the economy and promoting social and economic development locally. Negative and mitigation impacts includes: i) the permanent and temporary acquired land due to project construction will be compensated following compensation plan which is approved by local authorities. During construction phase, cultivate and public transportation acquired land for campsites, transmission line and auxiliary facilities will be limited by contractors; ii) The contractors are responsible for inform to local authorities and residents on blasting areas; iii) disposals have to meet criteria: far from surface water at lease 100m, do not affect to surface water, cultivate land, do not locate on the risk of erosion, should locate on the hollow sites to mitigate sweep away by runoff water; iv) to establish the worker code at construction site containing regulations such as prohibiting workers to discard domestic or construction waste into surrounding areas, river, stream or places which may sweep away to surface water; v) do not allow to burn solid waste to mitigate risks of forest fire; vi) after construction phase, the mine, borrow pits or disposals etc must be restored by leveling ground then planting trees to prevent erosion; and vi) to arrange petrol, oil storages at least 300 m far from surface water, communities.
Publication Year: 2015
Publication Date: 2015-09-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot