Title: Research and Design of TP75 Overhead Launching Gantry for Segmental Assembling of Sutong Bridge
Abstract:The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and...The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and the superstructures of the parts of the bridges were erected by precast segmental assembling construction method.In this paper,the design alternatives,principal components and construction sequences of the TP75 overhead launching gantry used for the segmental assembling of the bridges are described.Read More
Publication Year: 2007
Publication Date: 2007-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot