Title: Quality Control of Foundation Excavating Construction of Arch Dam in Huanghuazai Hydropower Station
Abstract: The article introduced the construction method of dam foundation excavating for 110m double-curvature arch dam of Huanghuazai Hydropower Station in Guizhou.The study and practice was in construction mainly in these respects such as controlling hole interval,hole depth of presplit openings of dam foundation,as well as charge density and charge structure.This achieved good results in construction excavating and ensured the quality of dam foundation excavating.
Publication Year: 2009
Publication Date: 2009-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot