Title: In A Power Plant in Xinjiang Office Semi-central Evaporative Air-conditioning System Application Analysis
Abstract: The design process of semi-central evaporative air conditioning system was briefly introduced,the application of a certain power plant in xinjiang office semi-central evaporative air conditioning system for detailed analysis of the test.Test results show that: three new air handling units to evaporative cooling outdoor dry bulb temperature of 35℃,wet bulb temperature of 19.8℃ air treatment to dry bulb temperature is 15℃ low temperature air into the room.Evaporative cooling high-temperature water chiller system to take dry-bulb temperature of 17℃ cold water,fully meet the requirements of dry-type fan coil.Evaporative cooling throughout the series semi-centralized system,fan coil return water at high temperatures can be cooler outdoor air temperature 7℃ lower than the formation of a cooling capacity of multiple use.Also hope that through this analysis of the relevant instance of the design process designers to provide a reference.
Publication Year: 2012
Publication Date: 2012-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot