Title: Optimal Design of Access Tunnel for Construction of Underground Powerhouse Crown in Extension Project of Yantan Hydropower Station
Abstract: The construction progress of access tunnel, for the underground powerhouse crown, directly decides the progress of the whole project. Therefore, this access tunnel is required to be arranged reasonably and completed as soon as possible, so as to shorten the construction period of the first unit and bring about direct economic benefit to the project. The paper makes a detailed introduction to the optimal design.