Title: Conversion project of 1000t/h once-through boiler to controlled circulation boiler
Abstract: In order to solve poor reliability and peaking performance of once-through boiler,the1000t/h UP type once-through boiler in Jianbi Power Plant was retrofitted,with once-through boiler converted to controlled circulation drum boiler and double furnace con-verted to single furnace.The operating status of boiler after conversion showed that,the operating reliability,economics and peaking capability of boiler were evidently improved,the economic benefit gained from the retrofit could compensate for the whole cost of the retrofit in three years.This conversion project provided the experience and reference for the similar retrofit of utility boiler.