Title: The Design and Construction Optimizationof the Macao River Arch Dam
Abstract: The Macao River hydropower dam is an additive MgO style arch dam without joints.Researchers optimized the parabolic arch ring which had been designed at preliminary stage into unified quadratic curve-arch ring of double curved arch dam by intensive research on the geological conditions during the stage of construction.Under the premise of meeting the requirements of the dam stress level and the abutment's anti-sliding stability,constructors saved much project of dam foundation's excavation and dam concrete.At the same time,researchers adopted MgO Dam's construction technology,reducing the difficult in construction and made the power generation in advance which had an economic efficiency and social efficiency.
Publication Year: 2010
Publication Date: 2010-01-01
Language: en
Type: article
Access and Citation
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot