Title: Numerical Simulation on Dredging Channel of Guishui River Mouth Bar of Guanting Reservoir
Abstract: Several dredging plans have been conducted by the mathematical model.The simulated results show that the amount of silt in the dredged channel could be affected by the oncoming flow and sediment, the relative position between the channel and the mouth, and the operation water level of Guanting reservoir. To restore the water supply to Beijing city, it is suggested that the dredging plan of 15~50m wide dredge channel should be implemented in the current project. In the future, a 300m wide dredge channel should be applied. In the permission of cost, it would be better to take both measurements of dredging channel and training dike.
Publication Year: 2003
Publication Date: 2003-01-01