Title: Capacitive icing measurement in a 220 kV overhead power line environment
Abstract: Icing of high-voltage overhead power lines can affect the safe operation of the power distribution grid due to the additional weight load of the accumulated ice layer. Monitoring and predicting of icing enable its removal at an early stage. In this paper, we present the first field test results of a capacitive icing detector powered by a capacitive energy harvester on a 220 kV overhead power line. Reference data collection was performed by a weather camera system. The field test was carried out in winter 2009/2010 on a 220 kV overhead power line. Several icing and snow deposition events have been detected.
Publication Year: 2010
Publication Date: 2010-11-01
Language: en
Type: article
Indexed In: ['crossref']
Access and Citation
Cited By Count: 9
AI Researcher Chatbot
Get quick answers to your questions about the article from our AI researcher chatbot